
Sun Technical Compute Farm Read Me First • December 2000 17
b. Connect the terminal server cabling.
Refer to Chapter 5 in the Sun Technical Compute Farm Installation and Service
Manual.
5. Connect the power cable to the back panel of the terminal server as described in
the Cisco AS2509-RJ and AS2511-RJ Access Server Hardware Installation Guide.
6. Reinstall the 4RU filler panel on the front of the rack.
7. Power on the system.
Refer to Chapter 6 in the Sun Technical Compute Farm Installation and Service Manual.
8. Replace, close, and lock the rack door(s) as appropriate.
Comentários a estes Manuais