Cisco SGE2000 Especificações Página 12

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 50
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 11
Chapter
3
8
Chapter 3: Connecting the Switch
Overview
Linksys One Ready Communications Solution
Connecting the Switch
Overview
This chapter will explain how to connect network devices to the Ethernet switch. For an
example of a possible network configuration, see the application diagrams shown below.
Before You Install the Switch...
When you choose a location for the Ethernet switch, observe the following guidelines:
Make sure that the Ethernet switch will be accessible and that the cables can be easily
connected.
Keep cabling away from sources of electrical noise, power lines, and fluorescent lighting
fixtures.
Position the Ethernet switch away from water and moisture sources.
To ensure adequate air flow, be sure to provide a minimum clearance of two inches
(50 mm) around the air intake and exhaust ports on the sides of the Ethernet switch.
Do not stack free-standing Ethernet switches more than four units high. The stacking
configuration, described in ”Stacking Multiple Switches,” on page 12, allows up to eight
Vista de página 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 49 50

Comentários a estes Manuais

Sem comentários