Cisco CX-FEIP-2TX= Installation and con?guration Especificações

Consulte online ou descarregue Especificações para Redes Cisco CX-FEIP-2TX= Installation and con?guration. Cisco CX-FEIP-2TX= Installation and con?guration Specifications Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 493
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
Corporate Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000
800 553-NETS (6387)
Fax: 408 526-4100
Cisco ONS 15454 Installation and
Operations Guide
Product and Documentation Release 3.2
Last Updated: January 10, 2005
Customer Order Number: DOC-7914065=
Text Part Number: 78-14065-01
Vista de página 0
1 2 3 4 5 6 ... 492 493

Resumo do Conteúdo

Página 1 - Operations Guide

Corporate HeadquartersCisco Systems, Inc.170 West Tasman DriveSan Jose, CA 95134-1706 USAhttp://www.cisco.comTel: 408 526-4000800 553-NETS (6387)Fax:

Página 2

ContentsxCisco ONS 15454 Installation and Operations Guide, R3.2 March 20026.7 Creating a Path Trace 6-12Create a J1 Path Trace 6-136.8 Cross-Connect

Página 3 - CONTENTS

1-60Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationCable Routing and ManagementFigure 1-38 Ba

Página 4

1-61Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationFerrite Installation1.15 Ferrite Installa

Página 5

1-62Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationFerrite InstallationFigure 1-41 Attaching

Página 6

1-63Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationFerrite InstallationFigure 1-43 Attaching f

Página 7

1-64Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationONS 15454 Assembly Specifications1.16 ON

Página 8

1-65Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationONS 15454 Assembly Specifications• OC12 LR

Página 9

1-66Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationONS 15454 Assembly Specifications1.16.6 E

Página 10 - March 2002

1-67Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationInstallation Checklist1.16.13 System Timin

Página 11

1-68Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationONS 15454 Software and Hardware Compatibil

Página 12

1-69Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationONS 15454 Software and Hardware Compatibili

Página 13

ContentsxiCisco ONS 15454 Installation and Operations Guide, R3.2March 2002Convert DS3-12 Cards From 1:1 to 1:N Protection 7-33Performance Monitoring

Página 14

1-70Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationONS 15454 Software and Hardware Compatibil

Página 15

CHAPTER2-1Cisco ONS 15454 Installation and Operations Guide, R3.2March 20022Software InstallationCisco Transport Controller (CTC), the Cisco ONS 15454

Página 16

2-2Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 2 Software InstallationComputer Requirements3. If the computer does

Página 17

2-3Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 2 Software InstallationComputer RequirementsTable 2-2 Computer Requir

Página 18

2-4Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 2 Software InstallationRunning the CTC Setup WizardNote On PCs, the

Página 19

2-5Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 2 Software InstallationConnecting PCs to the ONS 15454Procedure: Refe

Página 20

2-6Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 2 Software InstallationConnecting PCs to the ONS 15454Step 2 Use the

Página 21

2-7Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 2 Software InstallationConnecting PCs to the ONS 15454b. Enter the Ci

Página 22

2-8Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 2 Software InstallationConnecting PCs to the ONS 15454Step 1 From th

Página 23

2-9Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 2 Software InstallationLogging into the ONS 15454• Telnet to port 308

Página 24

ContentsxiiCisco ONS 15454 Installation and Operations Guide, R3.2 March 20029.1.3 Ethernet Link Integrity Support 9-49.1.4 Gigabit EtherChannel/802.3

Página 25

2-10Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 2 Software InstallationLogging into the ONS 15454Figure 2-1 Logging

Página 26

2-11Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 2 Software InstallationLogging into the ONS 154542.5.1 Creating Lo

Página 27

2-12Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 2 Software InstallationLogging into the ONS 15454Step 4 Under Membe

Página 28

2-13Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 2 Software InstallationLogging into the ONS 15454Figure 2-4 A CTC co

Página 29 - Hardware Installation

2-14Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 2 Software InstallationWorking with the CTC Window2.6 Working wit

Página 30

2-15Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 2 Software InstallationWorking with the CTC Window2.6.1.2 Node Vie

Página 31

2-16Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 2 Software InstallationWorking with the CTC Window2.6.2 Network V

Página 32 - Ethernet Operation

2-17Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 2 Software InstallationWorking with the CTC Window2.6.2.2 Network

Página 33 - Procedures

2-18Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 2 Software InstallationWorking with the CTC Window2.6.2.3 Creatin

Página 34

2-19Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 2 Software InstallationWorking with the CTC WindowWithin the domain,

Página 35 - About This Manual

ContentsxiiiCisco ONS 15454 Installation and Operations Guide, R3.2March 20029.6.3 E Series VLAN Membership 9-38Provision Ethernet Ports for VLAN Memb

Página 36 - Related Documentation

2-20Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 2 Software InstallationWorking with the CTC Window2.6.2.4 Changin

Página 37 - Obtaining Documentation

2-21Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 2 Software InstallationWorking with the CTC WindowFigure 2-10 Changi

Página 38 - Documentation Feedback

2-22Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 2 Software InstallationWorking with the CTC WindowStep 7 At the net

Página 39 - Cisco TAC Escalation Center

2-23Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 2 Software InstallationCTC NavigationFigure 2-12 CTC card view showi

Página 40

2-24Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 2 Software InstallationCTC NavigationFigure 2-13 CTC node view show

Página 41

2-25Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 2 Software InstallationViewing CTC Table Data2.8 Viewing CTC Table

Página 42 - 1.1 Installation Overview

2-26Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 2 Software InstallationViewing CTC Table DataFigure 2-14 Table shor

Página 43 - 1.2 Installation Equipment

2-27Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 2 Software InstallationPrinting and Exporting CTC Data2.9 Printing

Página 44 - 1.2.1 Included Materials

2-28Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 2 Software InstallationPrinting and Exporting CTC DataProvisioning

Página 45 - 1.3 Rack Installation

2-29Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 2 Software InstallationPrinting and Exporting CTC DataProcedure: Pri

Página 46 - Rack Installation

ContentsxivCisco ONS 15454 Installation and Operations Guide, R3.2 March 200210.2.4 Viewing History 10-710.2.5 Viewing Alarms on the LCD 10-8View Alar

Página 47 - 1.3.2 Mounting a Single Node

2-30Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 2 Software InstallationDisplaying CTC Data in Other ApplicationsFig

Página 48 - (reversible)

CHAPTER3-1Cisco ONS 15454 Installation and Operations Guide, R3.2March 20023Node SetupThis chapter explains how to set up a Cisco ONS 15454 node using

Página 49

3-2Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 3 Node SetupSetting Up Basic Node Information3.2 Setting Up Basic N

Página 50

3-3Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 3 Node SetupSetting Up Network InformationSubnetting enables LAN admi

Página 51 - 1.4 Front Door Access

3-4Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 3 Node SetupSetting Up Network InformationFigure 3-1 Setting up gene

Página 52 - Front Door Access

3-5Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 3 Node SetupSetting Up Network InformationFigure 3-2 Selecting the IP

Página 53 - Open the door

3-6Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 3 Node SetupCreating Users and Setting SecuritySaving the new config

Página 54 - 1.5 Backplane Access

3-7Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 3 Node SetupCreating Users and Setting SecurityEach ONS 15454 user ha

Página 55 - 1.5.1 Lower Backplane Cover

3-8Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 3 Node SetupCreating Users and Setting SecurityProcedure: Create New

Página 56 - 1.5.2 Alarm Interface Panel

3-9Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 3 Node SetupCreating Protection GroupsStep 5 Click OK and click Apply

Página 57 - 1.6 EIA Installation

ContentsxvCisco ONS 15454 Installation and Operations Guide, R3.2March 2002Regulatory and Compliance Requirements B-1Regulatory Compliance B-1Japan Ap

Página 58 - 1.6.2 High-Density BNC EIA

3-10Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 3 Node SetupCreating Protection GroupsBased on these selections, a

Página 59 - 1.6.3 SMB EIA

3-11Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 3 Node SetupCreating Protection GroupsStep 4 Click Apply.Procedure:

Página 60 - 1.6.4 AMP Champ EIA

3-12Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 3 Node SetupSetting Up ONS 15454 Timingb. In the Selected Group sec

Página 61 - AMP CHAMP

3-13Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 3 Node SetupSetting Up ONS 15454 TimingIn the example, Slots 5 and 6

Página 62 - EIA Installation

3-14Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 3 Node SetupSetting Up ONS 15454 TimingProcedure: Set Up ONS 15454

Página 63

3-15Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 3 Node SetupSetting Up ONS 15454 Timing• Revertive—If checked, the O

Página 64

3-16Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 3 Node SetupSetting Up ONS 15454 TimingFigure 3-9 Setting Up ONS 15

Página 65

3-17Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 3 Node SetupViewing ONS 15454 Inventory• SSM Message Set—Set to Gene

Página 66

3-18Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 3 Node SetupViewing ONS 15454 InventoryFigure 3-10 Displaying ONS 1

Página 67 - Fan-tray

3-19Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 3 Node SetupViewing CTC Software Versions3.8 Viewing CTC Software V

Página 68 - Power and Ground Installation

ContentsxviCisco ONS 15454 Installation and Operations Guide, R3.2 March 2002

Página 69 - FRAME GROUND

3-20Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 3 Node SetupViewing CTC Software Versions

Página 70 - Return leads (black)

CHAPTER 4-1Cisco ONS 15454 Installation and Operations Guide, R3.2March 20024IP NetworkingThis chapter explains how to set up Cisco ONS 15454s in inte

Página 71

4-2Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 4 IP NetworkingONS 15454 IP Addressing Scenarios4.2 ONS 15454 IP

Página 72 - 1.9.1 Alarm Installation

4-3Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 4 IP NetworkingONS 15454 IP Addressing ScenariosFigure 4-1 Scenario

Página 73 - 1.9.2 Timing Installation

4-4Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 4 IP NetworkingONS 15454 IP Addressing ScenariosFigure 4-2 Scenari

Página 74 - 1.9.3 LAN Installation

4-5Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 4 IP NetworkingONS 15454 IP Addressing ScenariosFigure 4-3 Scenario

Página 75

4-6Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 4 IP NetworkingONS 15454 IP Addressing Scenarios4.2.4 Scenario 4

Página 76 - Coaxial Cable Installation

4-7Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 4 IP NetworkingONS 15454 IP Addressing ScenariosFigure 4-5 Scenario

Página 77

4-8Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 4 IP NetworkingONS 15454 IP Addressing ScenariosFigure 4-6 Scenari

Página 78

4-9Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 4 IP NetworkingONS 15454 IP Addressing Scenarios• Mask—Enter a subne

Página 79 - DS-1 Cable Installation

FIGURES xviiCisco ONS 15454 Installation and Operations Guide, R3.2March 2002Figure 1-1 Cisco ONS 15454 dimensions 1-6Figure 1-2 Reversing the mountin

Página 80

4-10Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 4 IP NetworkingONS 15454 IP Addressing ScenariosFigure 4-7 Scenar

Página 81 - Adapter or balun

4-11Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 4 IP NetworkingONS 15454 IP Addressing Scenariosthe need to manuall

Página 82 - Binder Group) (continued)

4-12Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 4 IP NetworkingONS 15454 IP Addressing ScenariosFigure 4-9 Scenar

Página 83

4-13Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 4 IP NetworkingONS 15454 IP Addressing ScenariosFigure 4-10 Enablin

Página 84 - 1.12 Card Installation

4-14Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 4 IP NetworkingONS 15454 IP Addressing ScenariosStep 6 In the Pri

Página 85 - 1.12.1 Slot Requirements

4-15Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 4 IP NetworkingViewing the ONS 15454 Routing TableDead Int (sec)—Se

Página 86 - Card Installation

4-16Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 4 IP NetworkingViewing the ONS 15454 Routing TableFigure 4-11 Vie

Página 87

4-17Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 4 IP NetworkingViewing the ONS 15454 Routing Table• Mask (255.255.2

Página 88

4-18Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 4 IP NetworkingViewing the ONS 15454 Routing Table

Página 89

CHAPTER5-1Cisco ONS 15454 Installation and Operations Guide, R3.2March 20025SONET TopologiesThis chapter explains how to set up the Cisco ONS 15454 in

Página 90

FiguresxviiiCisco ONS 15454 Installation and Operations Guide, R3.2March 2002Figure 1-32 Attaching a fiber boot 1-54Figure 1-33 Managing cables on th

Página 91

5-2Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsNote Two-fiber BL

Página 92

5-3Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsThe SONET K1 and K

Página 93

5-4Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsFigure 5-3 Four-n

Página 94 - Cable Routing and Management

5-5Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsFigure 5-4 A four-

Página 95 - Fold down

5-6Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsFigure 5-5 A four

Página 96

5-7Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesBidirectional Line Switched Rings5.2.3 K3 Byte Rem

Página 97 - FAN FAIL

5-8Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesBidirectional Line Switched Ringscapacity is the O

Página 98 - Tie-wraps

5-9Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesBidirectional Line Switched Rings5.2.5 Sample BLSR

Página 99

5-10Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsFigure 5-10 Shel

Página 100 - Screw locations

5-11Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesBidirectional Line Switched Rings5.2.6 Setting Up

Página 101 - 1.15 Ferrite Installation

FiguresxixCisco ONS 15454 Installation and Operations Guide, R3.2March 2002Figure 3-7 Editing protection groups 3-11Figure 3-8 An ONS 15454 timing ex

Página 102 - 1730-0730 for each cable

5-12Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsFigure 5-12 Conn

Página 103 - Ferrite Installation

5-13Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsProcedure: Create

Página 104 - 1.16.1 Bandwidth

5-14Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsFigure 5-14 Enab

Página 105 - 1.16.4 Configurations

5-15Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsProcedure: Provis

Página 106

5-16Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsNote Some or all

Página 107 - 1.17 Installation Checklist

5-17Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsProcedure: Upgrad

Página 108

5-18Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsStep 8 Clear the

Página 109

5-19Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsFigure 5-16 A thr

Página 110

5-20Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesBidirectional Line Switched Rings• If the new nod

Página 111 - Software Installation

5-21Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsFigure 5-17 A BLS

Página 112 - 2.2 Computer Requirements

THE SPECIFICATIONS AND INFORMATION REGARDING THE PRODUCTS IN THIS MANUAL ARE SUBJECT TO CHANGE WITHOUT NOTICE. ALL STATEMENTS, INFORMATION, AND RECOM

Página 113 - Computer Requirements

FiguresxxCisco ONS 15454 Installation and Operations Guide, R3.2March 2002Figure 5-21 A basic four-node UPSR 5-28Figure 5-22 A UPSR with a fiber brea

Página 114 - Running the CTC Setup Wizard

5-22Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsProcedure: Remov

Página 115

5-23Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesBidirectional Line Switched Ringsg. Repeat Steps a

Página 116

5-24Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesBidirectional Line Switched Rings5.2.9 Moving BL

Página 117 - 2.4.2 Network Connections

5-25Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsFigure 5-19 A fou

Página 118

5-26Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesBidirectional Line Switched RingsWhen you perform

Página 119 - Logging into the ONS 15454

5-27Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesUnidirectional Path Switched RingsStep 7 Disable t

Página 120 - Login node group

5-28Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesUnidirectional Path Switched RingsFigure 5-21 A b

Página 121

5-29Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesUnidirectional Path Switched Rings5.3.1 Example U

Página 122 - Step 5 Click OK

5-30Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesUnidirectional Path Switched RingsFigure 5-24 Lay

Página 123

5-31Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesUnidirectional Path Switched Rings5.3.2 Setting U

Página 124 - 2.6.1 Node View

FiguresxxiCisco ONS 15454 Installation and Operations Guide, R3.2March 2002Figure 6-15 A DCC tunnel 6-22Figure 6-16 Selecting DCC tunnel end points 6

Página 125 - 2.6.1.3 Node View Tabs

5-32Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesUnidirectional Path Switched RingsFigure 5-26 Con

Página 126 - 2.6.2 Network View

5-33Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesUnidirectional Path Switched RingsProcedure: Enabl

Página 127 - 2.6.2.2 Network View Tasks

5-34Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesUnidirectional Path Switched RingsFigure 5-27 Usi

Página 128 - 2.6.2.3 Creating Domains

5-35Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesUnidirectional Path Switched RingsFigure 5-28 Swit

Página 129 - Table 2-8 Managing Domains

5-36Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesUnidirectional Path Switched Ringsb. Remove the w

Página 130 - Working with the CTC Window

5-37Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesSubtending Ringsd. Click Yes when prompted.Step 4

Página 131

5-38Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesSubtending RingsFigure 5-29 An ONS 15454 with mul

Página 132 - 2.6.3 Card View

5-39Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesSubtending RingsProcedure: Subtend a UPSR from a B

Página 133 - 2.7 CTC Navigation

5-40Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesSubtending Ringsc. Click Apply.d. Repeat steps a

Página 134 - ONS 15454

5-41Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesSubtending RingsProcedure: Subtend a BLSR from a B

Página 135 - 2.8 Viewing CTC Table Data

FiguresxxiiCisco ONS 15454 Installation and Operations Guide, R3.2March 2002Figure 9-1 Data traffic using a G1000-4 point-to-point circuit 9-2Figure

Página 136 - Viewing CTC Table Data

5-42Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesLinear ADM ConfigurationsFigure 5-33 Configuring

Página 137 - DS-N Cards

5-43Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesLinear ADM ConfigurationsProcedure: Create a Linea

Página 138

5-44Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesLinear ADM ConfigurationsFigure 5-35 Verifying wo

Página 139 - Procedure: Export CTC Data

5-45Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesLinear ADM Configurationsc. Click Yes on the conf

Página 140

5-46Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesLinear ADM ConfigurationsFigure 5-37 Converting a

Página 141 - Node Setup

5-47Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesLinear ADM ConfigurationsStep 15 In the SDCC Termi

Página 142 - Chapter 3 Node Setup

5-48Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesLinear ADM ConfigurationsFigure 5-38 A UPSR displ

Página 143

5-49Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesLinear ADM Configurationsc. Verify that the workin

Página 144

5-50Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesLinear ADM ConfigurationsStep 9 In the middle nod

Página 145

5-51Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesPath-Protected Mesh NetworksBe sure to assign the

Página 146

FiguresxxiiiCisco ONS 15454 Installation and Operations Guide, R3.2March 2002Figure 9-36 MAC addresses recorded in the MAC table 9-49Figure 9-37 Crea

Página 147

5-52Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesPath-Protected Mesh NetworksFigure 5-40 A path-pr

Página 148 - Procedure: Delete a User

5-53Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 5 SONET TopologiesPath-Protected Mesh NetworksFigure 5-41 A PPMN vir

Página 149 - Creating Protection Groups

5-54Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 5 SONET TopologiesPath-Protected Mesh Networks

Página 150 - Procedure: Enable Ports

CHAPTER 6-1Cisco ONS 15454 Installation and Operations Guide, R3.2March 20026Circuits and TunnelsThis chapter explains how to create and administer Ci

Página 151

6-2Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCreating Circuits and VT TunnelsNote In this c

Página 152 - Setting Up ONS 15454 Timing

6-3Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCreating Circuits and VT Tunnels• Size—Select

Página 153

6-4Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCreating Circuits and VT TunnelsOptions includ

Página 154

6-5Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCreating Circuits and VT Tunnels• Using Requir

Página 155

6-6Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCreating Circuits and VT TunnelsProcedure: Cre

Página 156

6-7Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCreating Circuits and VT Tunnels• Revertive—Ch

Página 157 - Viewing ONS 15454 Inventory

FiguresxxivCisco ONS 15454 Installation and Operations Guide, R3.2March 2002

Página 158

6-8Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCreating Multiple Drops for Unidirectional Cir

Página 159 - Viewing CTC Software Versions

6-9Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCreating Monitor Circuits6.4 Creating Monitor

Página 160

6-10Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsSearching for Circuits6.5 Searching for Circ

Página 161 - IP Networking

6-11Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsEditing UPSR CircuitsFigure 6-6 Editing UPSR

Página 162 - Chapter 4 IP Networking

6-12Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCreating a Path TraceFORCE TO PROTECT—Forces

Página 163

6-13Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCreating a Path TraceProcedure: Create a J1 P

Página 164 - 15454s #2 and #3

6-14Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCreating a Path TraceFigure 6-7 Selecting the

Página 165

6-15Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCross-Connect Card CapacitiesStep 8 On the ci

Página 166

6-16Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCross-Connect Card Capacities6.8.1 VT1.5 Cro

Página 167

6-17Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCross-Connect Card CapacitiesFigure 6-9 Examp

Página 168

TABLESxxvCisco ONS 15454 Installation and Operations Guide, R3.2March 2002Table 1-1 Installation Tasks 1-3Table 1-2 External Timing Pin Assignments fo

Página 169

6-18Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCross-Connect Card Capacities• 21 STSs are av

Página 170

6-19Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCross-Connect Card Capacities• In the Figure

Página 171

6-20Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCross-Connect Card CapacitiesFigure 6-14 A si

Página 172 - Procedure: Set up OSPF

6-21Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCreating DCC Tunnelssufficient capacity, CTC

Página 173

6-22Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCreating DCC TunnelsFigure 6-15 A DCC tunnelW

Página 174

6-23Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCreating DCC TunnelsFigure 6-16 Selecting DCC

Página 175

6-24Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 6 Circuits and TunnelsCreating DCC Tunnels

Página 176

CHAPTER 7-1Cisco ONS 15454 Installation and Operations Guide, R3.2March 20027Card ProvisioningThis chapter provides Cisco ONS 15454 procedures for:• C

Página 177

7-2Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Electrical Cards7.2 Provisioning El

Página 178

7-3Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Electrical Cards7.2.1 DS-1 Card Par

Página 179 - SONET Topologies

TablesxxviCisco ONS 15454 Installation and Operations Guide, R3.2March 2002Table 5-2 Two-Fiber BLSR Capacity 5-8Table 5-3 Four-Fiber BLSR Capacity 5-8

Página 180 - 5.2.1 Two-Fiber BLSRs

7-4Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Electrical CardsStep 3 Depending on

Página 181

7-5Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Electrical CardsElect Path ThrshldES

Página 182 - 5.2.2 Four-Fiber BLSRs

7-6Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Electrical CardsStep 5 Click Apply.

Página 183

7-7Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Electrical CardsTable 7-3 DS-3 Card

Página 184

7-8Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Electrical CardsStep 5 Click Apply.

Página 185 - 5.2.4 BLSR Bandwidth

7-9Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Electrical CardsNote If the DS3E is

Página 186

7-10Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Electrical CardsLine ThrsholdCV Cod

Página 187 - Figure 5-9 A five-node BLSR

7-11Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Electrical CardsStep 5 Click Apply.

Página 188 - Free Slot

7-12Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Electrical CardsProcedure: Modify L

Página 189 - 5.2.6 Setting Up BLSRs

7-13Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Electrical CardsElect Path Thrshld

Página 190

TablesxxviiCisco ONS 15454 Installation and Operations Guide, R3.2March 2002Table 8-19 Near-End DS3 Line PMs for the DS3-12E and DS3N-12E Cards 8-28Ta

Página 191

7-14Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Electrical CardsStep 5 Click Apply.

Página 192 - Procedure: Remap the K3 Byte

7-15Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Electrical CardsStep 2 Click the Pr

Página 193 - Procedure: Provision the BLSR

7-16Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Electrical CardsThresholds - LineCV

Página 194

7-17Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Electrical CardsStep 5 Click Apply.

Página 195

7-18Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Optical CardsStep 6 Repeat Steps 4

Página 196

7-19Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Optical CardsStep 4 Click Apply. Pr

Página 197 - Procedure: Add a BLSR Node

7-20Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Optical CardsFigure 7-2 Provisionin

Página 198

7-21Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Optical CardsESErrored seconds Nume

Página 199

7-22Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Optical CardsNPJC-PdetNegative Poin

Página 200 - Procedure: Remove a BLSR Node

7-23Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning Optical CardsClick Apply. 7.3.2 Pr

Página 201

TablesxxviiiCisco ONS 15454 Installation and Operations Guide, R3.2March 2002Table 9-5 ONS 15454 and ONS 15327 Ethernet Circuit Combinations 9-14Table

Página 202

7-24Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning IPPMThe ONS 15454 performs section,

Página 203

7-25Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning IPPMFigure 7-3 IPPM provisioned for

Página 204

7-26Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning the Alarm Interface Controller7.5

Página 205

7-27Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning the Alarm Interface ControllerFigur

Página 206

7-28Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning the Alarm Interface Controller• Sev

Página 207 - Figure 5-23 An OC-3 UPSR

7-29Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningProvisioning the Alarm Interface Controller• Des

Página 208

7-30Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningConverting DS-1 and DS-3 Cards From 1:1 to 1:N P

Página 209 - 5.3.2 Setting Up a UPSR

7-31Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningConverting DS-1 and DS-3 Cards From 1:1 to 1:N P

Página 210

7-32Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningConverting DS-1 and DS-3 Cards From 1:1 to 1:N P

Página 211

7-33Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningConverting DS-1 and DS-3 Cards From 1:1 to 1:N P

Página 212

PROCEDURES xxixCisco ONS 15454 Installation and Operations Guide, R3.2March 2002Hardware InstallationReverse the Mounting Bracket to Fit a 19-Inch Rac

Página 213 - Procedure: Add a UPSR Node

7-34Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 7 Card ProvisioningConverting DS-1 and DS-3 Cards From 1:1 to 1:N P

Página 214

CHAPTER8-1Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 8Performance MonitoringPerformance monitoring parameters (PMs) are used by

Página 215 - 5.4 Subtending Rings

8-2Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringUsing the Performance Monitoring Screen8.1

Página 216 - 13 serve the UPSR

8-3Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringUsing the Performance Monitoring Screen8.1

Página 217 - Subtending Rings

8-4Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringUsing the Performance Monitoring ScreenNote

Página 218

8-5Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringUsing the Performance Monitoring ScreenFig

Página 219

8-6Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringUsing the Performance Monitoring Screen8.1.4

Página 220 - Linear ADM Configurations

8-7Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringUsing the Performance Monitoring Screen8.1

Página 221

8-8Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringUsing the Performance Monitoring Screen8.1.6

Página 222

8-9Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringChanging Thresholds• All interfaces on por

Página 223

iiiCisco ONS 15454 Installation and Operations Guide, R3.2March 2002CONTENTSAbout This Manual xxxvAudience xxxvOrganization xxxvRelated Documentation

Página 224

ProceduresxxxCisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Route the Coaxial Cables 1-57Route DS-1 Twisted-Pair Cables 1-58Instal

Página 225

8-10Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringEnabling Intermediate-Path Performance Moni

Página 226

8-11Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringEnabling Intermediate-Path Performance Mo

Página 227

8-12Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringEnabling Pointer Justification Count Parame

Página 228

8-13Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringEnabling Pointer Justification Count Para

Página 229 - Path-Protected Mesh Networks

8-14Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Cards

Página 230 - Working traffic

8-15Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Car

Página 231

8-16Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Cards

Página 232

8-17Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Car

Página 233 - Circuits and Tunnels

8-18Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Cards

Página 234

8-19Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Car

Página 235

ProceduresxxxiCisco ONS 15454 Installation and Operations Guide, R3.2March 2002Set Up Internal Timing 3-16IP NetworkingCreate a Static Route 4-8Set u

Página 236

8-20Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Cards

Página 237

8-21Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Car

Página 238

8-22Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Cards

Página 239

8-23Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Car

Página 240

8-24Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Cards

Página 241 - Creating Monitor Circuits

8-25Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Car

Página 242 - 6.6 Editing UPSR Circuits

8-26Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Cards

Página 243 - Editing UPSR Circuits

8-27Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Car

Página 244 - 6.7 Creating a Path Trace

8-28Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Cards

Página 245 - Creating a Path Trace

8-29Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Car

Página 246

ProceduresxxxiiCisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Create a J1 Path Trace 6-13Provision a DCC Tunnel 6-22Card Provision

Página 247 - Cross-Connect Card Capacities

8-30Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Cards

Página 248 - 6.8.1 VT1.5 Cross-Connects

8-31Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Car

Página 249

8-32Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Cards

Página 250

8-33Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Car

Página 251 - 6.8.2 VT Tunnels

8-34Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Cards

Página 252

8-35Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Electrical Car

Página 253 - 6.9 Creating DCC Tunnels

8-36Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Optical Cards8.6

Página 254 - Creating DCC Tunnels

8-37Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Optical CardsS

Página 255

8-38Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Optical CardsTab

Página 256

8-39Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Optical CardsT

Página 257 - Card Provisioning

ProceduresxxxiiiCisco ONS 15454 Installation and Operations Guide, R3.2March 2002Provision an E Series Hub and Spoke Ethernet Circuit 9-23Provision a

Página 258 - Provisioning Electrical Cards

8-40Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Optical CardsUAS

Página 259 - 7.2.1 DS-1 Card Parameters

8-41Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Optical Cards8

Página 260

8-42Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Optical CardsTab

Página 261

8-43Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Optical CardsT

Página 262 - 7.2.2 DS-3 Card Parameters

8-44Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Optical CardsPSD

Página 263

8-45Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Optical CardsS

Página 264 - 7.2.3 DS3E Card Parameters

8-46Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Optical Cards8.6

Página 265

8-47Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Optical CardsT

Página 266

8-48Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Optical CardsTab

Página 267

8-49Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Chapter 8 Performance MonitoringPerformance Monitoring for Optical CardsP

Página 268

ProceduresxxxivCisco ONS 15454 Installation and Operations Guide, R3.2 March 2002

Página 269

8-50Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 8 Performance MonitoringPerformance Monitoring for Optical CardsSTS

Página 270 - 7.2.5 EC1-12 Card Parameters

CHAPTER9-1Cisco ONS 15454 Installation and Operations Guide, R3.2March 20029Ethernet OperationThe Cisco ONS 15454 integrates Ethernet into a SONET tim

Página 271

9-2Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationG1000-4 Card• High Availability (including hitle

Página 272

9-3Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationG1000-4 CardThe G1000-4 card can carry over a SON

Página 273

9-4Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationG1000-4 Card9.1.3 Ethernet Link Integrity Suppo

Página 274 - Provisioning Optical Cards

9-5Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationG1000-4 Cardthe G1000-4. The G1000-4 supports Gig

Página 275

9-6Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationG1000-4 CardFigure 9-4 G1000-4 card faceplate LE

Página 276

9-7Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationG1000-4 Card9.1.6 G1000-4 Port ProvisioningThis

Página 277

9-8Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationG1000-4 CardFigure 9-5 Provisioning G1000-4 Ethe

Página 278

9-9Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationE Series Cards9.1.7 G1000-4 Gigabit Interface Co

Página 279

xxxvCisco ONS 15454 Installation and Operations Guide, R3.2March 2002About This Manual This section explains who should read the Cisco ONS 15454 Inst

Página 280 - 7.4 Provisioning IPPM

9-10Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationE Series Cards9.2.1 E100T-12/E100T-G CardE100T

Página 281 - Provisioning IPPM

9-11Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationE Series CardsStp Enabled column. For more infor

Página 282 - 7.5.1 Using Virtual Wires

9-12Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationE Series Multicard and Single-Card EtherSwitch9

Página 283

9-13Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationE Series Multicard and Single-Card EtherSwitchFi

Página 284

9-14Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationE Series Circuit Configurations5. STS 3c + STS

Página 285

9-15Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationE Series Circuit ConfigurationsCaution Multi-car

Página 286 - Step 5 Click Apply

9-16Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationE Series Circuit ConfigurationsFigure 9-11 A Si

Página 287

9-17Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationE Series Circuit ConfigurationsThe Circuit Creat

Página 288

9-18Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationE Series Circuit Configurations• Circuit name•

Página 289

9-19Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationE Series Circuit ConfigurationsStep 4 Under Card

Página 290

xxxviCisco ONS 15454 Installation and Operations Guide, R3.2 March 2002About This ManualRelated DocumentationRelated DocumentationCisco ONS 15454 Tro

Página 291 - Performance Monitoring

9-20Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationE Series Circuit ConfigurationsFigure 9-14 Choo

Página 292 - 8.1.1 Viewing PMs

9-21Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationE Series Circuit ConfigurationsFigure 9-16 Addin

Página 293

9-22Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationE Series Circuit ConfigurationsFigure 9-17 View

Página 294

9-23Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationE Series Circuit ConfigurationsFigure 9-18 A Hub

Página 295 - Near End and Far End buttons

9-24Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationE Series Circuit ConfigurationsChoose the node

Página 296 - Signal-type menus

9-25Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationE Series Circuit ConfigurationsStep 28 Choose th

Página 297 - Baseline button

9-26Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationE Series Circuit ConfigurationsStep 2 Double-cl

Página 298 - 8.1.6 Using the Clear Button

9-27Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationE Series Circuit Configurationsb. Assign an easi

Página 299 - 8.2 Changing Thresholds

9-28Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationE Series Circuit ConfigurationsCaution If a CAR

Página 300

9-29Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationE Series Circuit ConfigurationsStep 13 Choose Et

Página 301

xxxviiCisco ONS 15454 Installation and Operations Guide, R3.2March 2002About This ManualConventionsRelated products:Cisco ONS 15216 EDFA2 Operations

Página 302

9-30Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationG1000-4 Circuit ConfigurationsNote If the circu

Página 303

9-31Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationG1000-4 Circuit Configurations9.5.1 G1000-4 Poi

Página 304

9-32Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationG1000-4 Circuit ConfigurationsStep 2 In CTC nod

Página 305

9-33Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationG1000-4 Circuit ConfigurationsFigure 9-26 Circui

Página 306

9-34Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationG1000-4 Circuit Configurations9.5.2 G1000-4 Ma

Página 307

9-35Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationG1000-4 Circuit ConfigurationsFigure 9-28 Circui

Página 308

9-36Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationE Series VLAN SupportCaution If a CARLOSS alarm

Página 309

9-37Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationE Series VLAN SupportFigure 9-29 A Q-tag moving

Página 310

9-38Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationE Series VLAN Support Figure 9-30 The priority

Página 311

9-39Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationE Series VLAN SupportProcedure: Provision Ethern

Página 312

xxxviiiCisco ONS 15454 Installation and Operations Guide, R3.2 March 2002About This ManualObtaining Technical AssistanceWorld Wide WebYou can access

Página 313

9-40Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationE Series Spanning Tree (IEEE 802.1D)Note If Tag

Página 314

9-41Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationE Series Spanning Tree (IEEE 802.1D)9.7.1 E Ser

Página 315

9-42Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationE Series Spanning Tree (IEEE 802.1D)9.7.3 E Se

Página 316 - STS UAS-P

9-43Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationG1000-4 Performance and Maintenance ScreensNote

Página 317

9-44Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationG1000-4 Performance and Maintenance ScreensNote

Página 318

9-45Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationG1000-4 Performance and Maintenance ScreensNote

Página 319

9-46Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationG1000-4 Performance and Maintenance Screens9.8.

Página 320

9-47Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationG1000-4 Performance and Maintenance ScreensCauti

Página 321

9-48Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationG1000-4 Performance and Maintenance Screens9.8.

Página 322

9-49Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationG1000-4 Performance and Maintenance Screens9.8.4

Página 323

xxxixCisco ONS 15454 Installation and Operations Guide, R3.2March 2002About This ManualObtaining Technical AssistanceCisco.comCisco.com is the founda

Página 324

9-50Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationRemote Monitoring Specification Alarm Threshold

Página 325

9-51Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationRemote Monitoring Specification Alarm Thresholds

Página 326

9-52Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationRemote Monitoring Specification Alarm Threshold

Página 327

9-53Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 9 Ethernet OperationRemote Monitoring Specification Alarm Thresholds

Página 328

9-54Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 9 Ethernet OperationRemote Monitoring Specification Alarm Threshold

Página 329

CHAPTER10-1Cisco ONS 15454 Installation and Operations Guide, R3.2March 200210Alarm Monitoring and ManagementThis chapter explains how to manage alarm

Página 330

10-2Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 10 Alarm Monitoring and ManagementViewing ONS 15454 AlarmsFigure 10

Página 331

10-3Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 10 Alarm Monitoring and ManagementViewing ONS 15454 AlarmsAlarms dis

Página 332

10-4Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 10 Alarm Monitoring and ManagementViewing ONS 15454 AlarmsFigure 10

Página 333

10-5Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 10 Alarm Monitoring and ManagementViewing ONS 15454 AlarmsFigure 10-

Página 334

ContentsivCisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Open the Front Cabinet Compartment (Door) 1-12Remove the Front Door 1-131.

Página 335

xlCisco ONS 15454 Installation and Operations Guide, R3.2 March 2002About This ManualObtaining Technical AssistanceBefore calling, please check with

Página 336

10-6Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 10 Alarm Monitoring and ManagementViewing ONS 15454 AlarmsFigure 10

Página 337

10-7Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 10 Alarm Monitoring and ManagementViewing ONS 15454 Alarms10.2.4 Vi

Página 338

10-8Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 10 Alarm Monitoring and ManagementAlarm Profiles10.2.5 Viewing Ala

Página 339

10-9Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 10 Alarm Monitoring and ManagementAlarm Profiles10.3.1 Creating and

Página 340

10-10Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 10 Alarm Monitoring and ManagementAlarm ProfilesProfile names must

Página 341

10-11Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 10 Alarm Monitoring and ManagementAlarm Profiles10.3.1.3 Alarm Sev

Página 342 - 9.1.1 G1000-4 Application

10-12Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 10 Alarm Monitoring and ManagementAlarm ProfilesFigure 10-8 Node v

Página 343 - G1000-4 Card

10-13Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 10 Alarm Monitoring and ManagementAlarm ProfilesProcedure: Apply an

Página 344

10-14Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 10 Alarm Monitoring and ManagementSuppressing Alarms10.4 Suppress

Página 345 - 9.1.5 G1000-4 LEDs

10-15Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 10 Alarm Monitoring and ManagementSuppressing AlarmsNote When you u

Página 346 - ACT/LINK LED

CHAPTER1-1Cisco ONS 15454 Installation and Operations Guide, R3.2January 20051Hardware InstallationThis chapter provides procedures for installing the

Página 347

10-16Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 10 Alarm Monitoring and ManagementSuppressing Alarms

Página 348

CHAPTER11-1Cisco ONS 15454 Installation and Operations Guide, R3.2March 200211SNMPThis chapter explains Simple Network Management Protocol (SNMP) as i

Página 349 - 9.2 E Series Cards

11-2Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 11 SNMPSNMP Basic ComponentsFigure 11-1 A basic network managed by

Página 350 - 9.2.3 E Series LEDs

11-3Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 11 SNMPSNMP SupportFigure 11-3 Example of the primary SNMP component

Página 351 - E Series Cards

11-4Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 11 SNMPSNMP SupportFigure 11-4 Setting up SNMPStep 4Type the IP add

Página 352 - Table 9-4 Available GBICs

11-5Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 11 SNMPSNMP Management Information BasesFigure 11-5 Viewing trap des

Página 353

11-6Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 11 SNMPSNMP TrapsA managed object (sometimes called a MIB object) i

Página 354 - 7. 12 STS-1s

11-7Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 11 SNMPSNMP Trapsalarm is service affecting or non-service affecting

Página 355

11-8Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 11 SNMPSNMP TrapsThe ONS 15454 supports the generic and IETF traps

Página 356

11-9Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Chapter 11 SNMPSNMP Community Names11.6 SNMP Community NamesYou can provisi

Página 357

1-2Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationInstallation OverviewWarningThe ONS 15454 i

Página 358

11-10Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Chapter 11 SNMPSNMP Remote Network MonitoringONS 15454 RMON implementation

Página 359

A-1Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002APPENDIXACircuit RoutingThis appendix provides an in-depth explanation of ONS 154

Página 360

A-2Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Appendix A Circuit RoutingAutomatic Circuit RoutingCircuit Routing Character

Página 361

A-3Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Appendix A Circuit RoutingManual Circuit RoutingFigure A-2 Secondary sources

Página 362 - Step 31 Click Finish

A-4Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Appendix A Circuit RoutingManual Circuit Routing• If you enabled Fully Path

Página 363

A-5Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Appendix A Circuit RoutingManual Circuit RoutingFigure A-5 Ethernet shared p

Página 364

A-6Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Appendix A Circuit RoutingManual Circuit Routing- 2 2 - Double UPSR11--Two W

Página 365 - Ethernet

A-7Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Appendix A Circuit RoutingConstraint-Based Circuit RoutingAlthough virtual U

Página 366

A-8Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Appendix A Circuit RoutingConstraint-Based Circuit Routing

Página 367

B-1Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 APPENDIXBRegulatory and Compliance RequirementsThis appendix lists customer, ind

Página 368

1-3Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationInstallation EquipmentThe ONS 15454 is power

Página 369

B-2Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Appendix B Regulatory and Compliance RequirementsJapan ApprovalsJapan Appro

Página 370

B-3Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Appendix B Regulatory and Compliance RequirementsJapan ApprovalsElectrical

Página 371 - ONS Node ONS Node

B-4Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Appendix B Regulatory and Compliance RequirementsKorea ApprovalsOptical Car

Página 372

B-5Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Appendix B Regulatory and Compliance RequirementsInstallation WarningsInsta

Página 373

B-6Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Appendix B Regulatory and Compliance RequirementsInstallation WarningsDC Po

Página 374

B-7Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Appendix B Regulatory and Compliance RequirementsInstallation WarningsDC Po

Página 375

B-8Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Appendix B Regulatory and Compliance RequirementsInstallation WarningsPower

Página 376 - 9.6 E Series VLAN Support

B-9Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Appendix B Regulatory and Compliance RequirementsInstallation WarningsOutsi

Página 377 - Data Flow

B-10Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Appendix B Regulatory and Compliance RequirementsInstallation WarningsClas

Página 378

B-11Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Appendix B Regulatory and Compliance RequirementsInstallation WarningsRest

Página 379 - E Series VLAN Support

1-4Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationInstallation Equipment1.2.1 Included Mater

Página 380 - Primary path (forwarding)

B-12Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Appendix B Regulatory and Compliance RequirementsInstallation WarningsGrou

Página 381 - Step 4 Click Apply

B-13Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Appendix B Regulatory and Compliance RequirementsInstallation WarningsQual

Página 382

B-14Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Appendix B Regulatory and Compliance RequirementsInstallation WarningsMore

Página 383 - 9.8.1.1 Statistics Window

B-15Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Appendix B Regulatory and Compliance RequirementsInstallation WarningsUnte

Página 384

B-16Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Appendix B Regulatory and Compliance RequirementsInstallation WarningsWarn

Página 385 - 9.8.1.2 Utilization Window

B-17Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 Appendix B Regulatory and Compliance RequirementsInstallation WarningsLase

Página 386 - 9.8.1.4 History Window

B-18Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Appendix B Regulatory and Compliance RequirementsInstallation Warnings

Página 387 - 9.8.3.1 Statistics Window

AC-1Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 ACRONYMSNumerics10BaseTstandard 10 megabit per second local area network over un

Página 388 - 9.8.3.4 History Window

AcronymsAC-2Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002AMIAlternate Mark InversionANSIAmerican National Standards InstituteAPSA

Página 389 - 9.8.4.1 MAC Table Window

AcronymsAC-3Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 BPDUBridge Protocol Data UnitCCAT 5Category 5 (cabling)CCITTConsultative

Página 390

1-5Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationRack Installation• Listed pressure terminal

Página 391

AcronymsAC-4Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002DDCCData Communications ChannelDCNData Communications NetworkDCSDistribu

Página 392

AcronymsAC-5Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 EFTElectrical Fast Transient/Burst EIAElectrical Interface AssembliesELR

Página 393

AcronymsAC-6Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002FEFrame Bit ErrorsFG1Frame Ground #1(pins are labeled “FG1,” “FG2,” etc.

Página 394

AcronymsAC-7Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 IPInternet Protocol IPPMIntermediate-Path Performance MonitoringI/OInput

Página 395 - 10.1 Overview

AcronymsAC-8Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002LVDSLow Voltage Differential SignalMMACMedia Access ControlMbpsMillion b

Página 396 - Viewing ONS 15454 Alarms

AcronymsAC-9Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 OOAM&POperations, Administration, Maintenance, and ProvisioningOCOpt

Página 397 - Table 10-3 Alarm Display

AcronymsAC-10Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002PPMNPath-Protected Mesh NetworkPSCProtection Switching CountPSDProtecti

Página 398

AcronymsAC-11Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 SCLSystem Communications LinkSDCCSection Data Communications Channel SD

Página 399 - 10.2.3 Conditions Tab

AcronymsAC-12Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002STASpanning Tree AlgorithmSTP Shielded Twisted Pair STS-1Synchronous Tr

Página 400

AcronymsAC-13Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002 TLSTransparent LAN serviceTMNTelecommunications Management NetworkTSATi

Página 401 - 10.2.4 Viewing History

1-6Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationRack InstallationWarningThe ONS 15454 must

Página 402 - 10.3 Alarm Profiles

AcronymsAC-14Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002VPNVirtual Private NetworkVT1.5Virtual Tributary equals 1.544 megabits

Página 403 - Alarm Profiles

GL-1Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002GLOSSARYNumerics1:1 protectionA card protection scheme that pairs a working card

Página 404 - 10.3.1.1 Alarm Profile Menus

GlossaryGL-2Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002AMIAlternate Mark Inversion. Line-code format used on T1 circuits that t

Página 405 - 10.3.1.4 Row Display Options

GlossaryGL-3Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Broadcast Data packet that will be sent to all nodes on a network. Broadc

Página 406

GlossaryGL-4Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002CVcode violationDDCCData Communications Channel. Used to transport infor

Página 407

GlossaryGL-5Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002EOWExpress Orderwire. A permanently connected voice circuit between selec

Página 408 - 10.4 Suppressing Alarms

GlossaryGL-6Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Host numberPart of IP address used to address an individual host within

Página 409 - Suppressing Alarms

GlossaryGL-7Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Link budgetThe difference between the output power and receiver power of

Página 410

GlossaryGL-8Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Multiplex payloadGenerates section and line overhead, and converts elect

Página 411 - 11.1 SNMP Overview

GlossaryGL-9Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002Output contacts (alarms)Triggers that drive visual or audible devices suc

Página 412 - 11.2 SNMP Basic Components

1-7Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationRack InstallationThe shelf assembly comes pr

Página 413 - 11.3 SNMP Support

GlossaryGL-10Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002RRed bandDWDM wavelengths are broken into two distinct bands: red and b

Página 414 - SNMP Support

GlossaryGL-11Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002SPESynchronous Payload Envelope. A SONET term describing the envelope th

Página 415 - Table 11-1 SNMP Message Types

GlossaryGL-12Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002TagIdentification information, including a number plus other informatio

Página 416 - 11.5 SNMP Traps

GlossaryGL-13Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002UPSRUnidirectional Path Switched Ring. Path-switched SONET rings that em

Página 417 - SNMP Traps

GlossaryGL-14Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002

Página 418

IN-1Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002INDEXNumerics1+1 optical card protectiondescription3-9creating a protection group

Página 419 - 11.6 SNMP Community Names

IndexIN-2Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002traps see SNMPuser-provisionable7-26 to 7-29viewing 10-1wires 1-33alarm set

Página 420 - 11.7.5 Event Group

IndexIN-3Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002four-fiber description 5-4maximum node number 5-1moving trunk cards 5-24plan

Página 421 - Circuit Routing

IndexIN-4Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002deleting and recreating circuits for a linear to ring conversion5-47, 5-50d

Página 422 - Secondary Sources and Drops

IndexIN-5Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002description 2-14card view 2-22network see network viewnode see node viewCV-L

Página 423 - Manual Circuit Routing

1-8Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationRack InstallationFigure 1-3 Mounting an ONS

Página 424

IndexIN-6Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002DS1 AISS-P parameter 8-33DS-1 cables 1-39AMP Champ connector installation 1

Página 425

IndexIN-7Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002DS3XM-6 card 8-32DS3 SES-P parameter 8-25DS3 SESP-P parameterDS3E cards8-28D

Página 426

IndexIN-8Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002G1000-4 9-1circuitshub-and-spoke9-22manual cross-connects 9-25, 9-34multica

Página 427

IndexIN-9Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002firewalls 2-12four-fiber BLSR see BLSRframe buffering9-3framing 3-15front do

Página 428

IndexIN-10Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002Internet Inter-ORB Protocol see IIOPinternet protocol see IPinteroperabili

Página 429 - Regulatory Compliance

IndexIN-11Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002line timing 3-12link aggregation 9-4link integrity 9-4listener port 2-13loc

Página 430 - Japan Approvals

IndexIN-12Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002setting up basic node information 3-2setting up timing 3-14tabs list 2-15v

Página 431

IndexIN-13Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002port filtering 2-12portscard list1-46drop 6-12enable for BLSR 5-13enable fo

Página 432 - Korea Approvals

IndexIN-14Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002OC-12, OC-28, OC-192 cards 8-44, 8-48provisioning PSD-L 7-22provisioning P

Página 433 - Installation Warnings

IndexIN-15Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002four-node configuration 1-9installing 1-7power and ground 1-27specification

Página 434

1-9Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationRack InstallationProcedure: Mount the Shelf

Página 435 - DC Power Connection Warning

IndexIN-16Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002OC-3 card 8-39STS ES-P parameterDS-1 cards8-23DS-3 cards 8-25DS3E cards 8-

Página 436

IndexIN-17Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002node view - Circuits 2-15node view - Conditions 2-15node view - History 2-1

Página 437

IndexIN-18Cisco ONS 15454 Installation and Operations Guide, R3.2 March 2002moving 5-25UPSR 5-31tunnelsee DCCsee VT tunneltwisted pair wire-wrap1-39,

Página 438 - Class 1 Laser Product Warning

IndexIN-19Cisco ONS 15454 Installation and Operations Guide, R3.2March 2002turn-up 1-47XCVT cardcapacities6-15card view 2-22see also cross-connectturn

Página 439 - Restricted Area Warning

ContentsvCisco ONS 15454 Installation and Operations Guide, R3.2March 20021.11.1 Twisted Pair Wire-Wrap Installation 1-39Install DS-1 Cables Using Ele

Página 440 - Ground Connection Warning

1-10Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationRack Installationbut not merge multiple no

Página 441 - Qualified Personnel Warning

1-11Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationFront Door AccessFigure 1-5 A four-shelf ON

Página 442 - More Than One Power Supply

1-12Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationFront Door AccessFigure 1-6 The front-door

Página 443 - Unterminated Fiber Warning

1-13Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationFront Door AccessFigure 1-8 The ONS 15454 f

Página 444

1-14Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationBackplane AccessFigure 1-9 Removing the ON

Página 445 - Laser Activation Warning

1-15Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationBackplane AccessFigure 1-10 Backplane sheet

Página 446

1-16Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationBackplane AccessFigure 1-11 Removing the l

Página 447 - Numerics

1-17Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationEIA Installation1.6 EIA InstallationOptio

Página 448 - Acronyms

1-18Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationEIA InstallationFigure 1-12 A BNC backplan

Página 449

1-19Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationEIA InstallationTo install coaxial cable wi

Página 450

ContentsviCisco ONS 15454 Installation and Operations Guide, R3.2 March 20021.16.9 Alarm Interface 1-661.16.10 EIA Interface 1-661.16.11 Nonvolatile M

Página 451

1-20Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationEIA InstallationFigure 1-14 An SMB EIA bac

Página 452

1-21Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationEIA InstallationFor information about AMP c

Página 453

1-22Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationEIA InstallationProcedure: Install a BNC,

Página 454

1-23Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationEIA InstallationFigure 1-17 Installing the

Página 455

1-24Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationFan-Tray Assembly InstallationProcedure: I

Página 456

1-25Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationFan-Tray Assembly InstallationThe front of

Página 457

1-26Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationFan-Tray Assembly InstallationNote If you

Página 458

1-27Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationPower and Ground InstallationCaution You mu

Página 459

1-28Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationPower and Ground InstallationWarningShut o

Página 460

1-29Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationPower and Ground InstallationThe existing g

Página 461

ContentsviiCisco ONS 15454 Installation and Operations Guide, R3.2March 20022.6.1.1 CTC Card Colors 2-142.6.1.2 Node View Card Shortcuts 2-152.6.1.3 N

Página 462 - Glossary

1-30Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationPower and Ground InstallationFigure 1-23 O

Página 463

1-31Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationAlarm, Timing, LAN, and Craft Pin Connectio

Página 464

1-32Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationAlarm, Timing, LAN, and Craft Pin Connecti

Página 465

1-33Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationAlarm, Timing, LAN, and Craft Pin Connectio

Página 466

1-34Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationAlarm, Timing, LAN, and Craft Pin Connecti

Página 467

1-35Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationAlarm, Timing, LAN, and Craft Pin Connectio

Página 468

1-36Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationCoaxial Cable Installation1.10 Coaxial C

Página 469

1-37Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationCoaxial Cable InstallationFigure 1-25 Using

Página 470

1-38Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationCoaxial Cable InstallationStep 4 Turn the

Página 471

1-39Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationDS-1 Cable InstallationFigure 1-26 Installi

Página 472

ContentsviiiCisco ONS 15454 Installation and Operations Guide, R3.2 March 20023.6.1 Network Timing Example 3-123.6.2 Synchronization Status Messaging

Página 473

1-40Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationDS-1 Cable InstallationCaution Always use

Página 474

1-41Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationDS-1 Cable Installationc. Terminate the shi

Página 475

1-42Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationDS-1 Cable InstallationTable 1-6 shows the

Página 476

1-43Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationDS-1 Cable InstallationCaution Always use t

Página 477

1-44Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationCard InstallationStep 3 Use the clips on t

Página 478

1-45Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationCard InstallationWarningInvisible laser rad

Página 479

1-46Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationCard InstallationSlots 7 and 11 are dedica

Página 480

1-47Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationCard Installation* When used as a protect

Página 481

1-48Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationCard InstallationNote If the FAIL LED is l

Página 482

1-49Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationCard InstallationStep 2 Slide the card alon

Página 483

ContentsixCisco ONS 15454 Installation and Operations Guide, R3.2March 2002Add a BLSR Node 5-19Remove a BLSR Node 5-225.2.9 Moving BLSR Trunk Cards 5-

Página 484

1-50Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationCard Installation1.12.2 Gigabit Interface

Página 485

1-51Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationCard InstallationFigure 1-30 Installing a G

Página 486

1-52Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationFiber-Optic Cable InstallationProcedure: R

Página 487

1-53Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationFiber-Optic Cable InstallationCaution Do no

Página 488

1-54Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationCable Routing and ManagementStep 1 Positio

Página 489

1-55Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationCable Routing and ManagementNote To remove

Página 490

1-56Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationCable Routing and ManagementFigure 1-34 Ro

Página 491

1-57Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationCable Routing and ManagementFigure 1-35 The

Página 492

1-58Cisco ONS 15454 Installation and Operations Guide, R3.2 January 2005Chapter 1 Hardware InstallationCable Routing and ManagementFigure 1-36 Ro

Página 493

1-59Cisco ONS 15454 Installation and Operations Guide, R3.2January 2005Chapter 1 Hardware InstallationCable Routing and Management1.14.4 AMP Cha

Comentários a estes Manuais

Sem comentários